Skip To Main Content
Skip To Main Content

Cairn University Athletics

G. Patrick Stillman Athletic Complex

With construction completed in 2022, the G. Patrick Stillman Athletic Complex is composed of three state-of-the-art facilities for our baseball, softball, men's lacrosse and men's and women's soccer teams.

The brand new turf stadium designed for men's and women's lacrosse and men's and women's soccer uses artificial turf spanning the entire field and holds a capacity of 300 fans, along with a concrete press box. The field is lined for both lacrosse and soccer, as Cairn hosted its first-ever men's lacrosse game at the complex in 2022, with soccer hosting their first home events in the fall of 2022.

The baseball diamond, situated alongside the Mason Activity Center down the third-base line, is a dirt/grass facility with two state-of-the-art dugouts and bullpens down the first and third base lines. The mound and home plate are clay-based, along with the bullpens. Projected capacity for the facility is 238 spectators. Dimensions: Left Field: 330 ft./ Center Field 400 ft./ Right Field: 330 ft.. 

The softball field, situated right after the entrance to the facility, is an all-dirt facility designed for intercollegiate softball play. The softball field includes two state-of-the-art dugouts and bullpens down the first and third base lines and projected capacity for the facility is 144 spectators as well as additional seating on the hill along the outfield.

The schedule for the facilities can be found here. Contact Brett Marks, Assistant Athletic Director for Facilities at 215.702.4408 for more information.

Skip Ad